One of our achievements includes contributing to the repair of the Alexandria Bridge at Ricketty Street for Sydney Transport, working alongside EPTEC PTY LTD. Our role focused on documenting the bridge repair drawings for the concrete and reinforcement repair works, ensuring compliance with the NSW government documentation procedure.
This project required a detailed understanding of technical standards, the bridge’s structural condition, and the various methods used for concrete and reinforcement repair. Collaborating closely with Sydney Transport authorities was essential to maintain precision and alignment with the required procedures.
The repair drawings were delivered successfully, meeting both budgetary and scheduling goals. By adhering to the NSW government’s strict documentation processes, the project achieved improved accuracy, minimized errors, and facilitated better communication among stakeholders while ensuring safety and quality.
Key aspects of our involvement included:
- Analysis and application of the documentation procedure.
- Inspection of the bridge’s condition.
- Development of detailed repair drawings.
- Preparation of accurate representation drawings.
- Review and approval of all technical documentation.
This project highlights our capability to support complex government and civil drafting requirements with precision and professionalism.